• Wow! We like getting married - congrats to Steve and Mina
  • Congratulations to Matthew & Hannah on their wedding
  • Freyer joins NIBS for work experience
  • Welcome back to Mrs Sarah Jones from her honeymoon
  • Snowdon completed (3 hour 42 mins). The challenge is completed. The Total Time inc travel 22 hours 32 mins. More detail to follow on website
  • Scarfell completed ( 3 hours 25 mins) Snowdon next.
  • 3 Peaks. Ben Nevis started @ 4.45pm and completed in 4 hours 22 mins. Now on our way to Scarfell Pike.
  • 3 Peaks. One down. Two to go.
  • Weather is overcast with light drizzle and low cloud. The Challenge starts at 5pm, countdown started. The team is warming up.
  • Challenge Day .

Motive Power

Servicing, maintenance, testing, battery replacement and supply of Motive Power products are also undertaken.

A separate report is completed following each visit for each battery inspected, giving a condition history from the comments and actions stated necessary to maintain autonomy. The report contains a detailed status of the cells and battery with future recommendations for montitoring and replacement along with the float readings taken from the battery.

i have a standard system approach to inspection which provides computer based reports. This system again is flexible enough to allow other customer requested items to be included.

Risk assessment and a method statement can be supplied if required.

view all news...