• Wow! We like getting married - congrats to Steve and Mina
  • Congratulations to Matthew & Hannah on their wedding
  • Freyer joins NIBS for work experience
  • Welcome back to Mrs Sarah Jones from her honeymoon
  • Snowdon completed (3 hour 42 mins). The challenge is completed. The Total Time inc travel 22 hours 32 mins. More detail to follow on website
  • Scarfell completed ( 3 hours 25 mins) Snowdon next.
  • 3 Peaks. Ben Nevis started @ 4.45pm and completed in 4 hours 22 mins. Now on our way to Scarfell Pike.
  • 3 Peaks. One down. Two to go.
  • Weather is overcast with light drizzle and low cloud. The Challenge starts at 5pm, countdown started. The team is warming up.
  • Challenge Day .

Installation

i offers an inclusive installation service which will safely install, at your premises, a battery of any design or manufacture, including seismic installations.

installation

This service can include, if required, a commissioning discharge test and certification.

All redundant materials will be removed in accordance with legislation, and the site left clean.

In case of large installations or where the customer requires, site visits will be made to ensure local conditions are met, and all aspects are considered to obtain minimal interruption to other site activities.

All installation work is carried out to customer satisfaction and is only completed when the customer’s signature is given for inclusion onto our job form and instruction sheet.

As with any extensive work package, i will issue after consultation with customer staff, a Method Statement and Risk Analysis as part of the work instruction.

view all news...