• Wow! We like getting married - congrats to Steve and Mina
  • Congratulations to Matthew & Hannah on their wedding
  • Freyer joins NIBS for work experience
  • Welcome back to Mrs Sarah Jones from her honeymoon
  • Snowdon completed (3 hour 42 mins). The challenge is completed. The Total Time inc travel 22 hours 32 mins. More detail to follow on website
  • Scarfell completed ( 3 hours 25 mins) Snowdon next.
  • 3 Peaks. Ben Nevis started @ 4.45pm and completed in 4 hours 22 mins. Now on our way to Scarfell Pike.
  • 3 Peaks. One down. Two to go.
  • Weather is overcast with light drizzle and low cloud. The Challenge starts at 5pm, countdown started. The team is warming up.
  • Challenge Day .

Impedance

This service is similar to the previously described Inspection and Report Service except for two main aspects.

impedance

  1. Impedance readings are taken in place of float voltage readings
  2. The impedance service does require the system to be off line for a short period whilst the impedance readings are taken.

All other report matters and comments are the same.

Impedance service includes both charted and listed readings.

In new installations, particularly UPS applications, regular impedance readings may extend the period between periodic discharge tests for capacity checks.

This brings the longer off - line time on a biennial frequency for BS discharge tests to either; near end - of - life or; if doubt exists about the battery condition from maintenance records as felt necessary.